logo
  • Company profile
    • Company profile
    • About CSG Group
    • Documents and certificates
    • Grant Projects
    • Whistleblowing
    • ESG Management
    • Et-link
  • Products
    • GCA Radar Sets
    • Air-traffic Surveillance Radar Systems
    • Precision Approach Radars
    • Air Traffic Control Systems
    • Radome
    • ATC Simulator
  • Services
    • Anechoic Chamber
    • Customer services
  • Career
    • Available positions
    • Students support and internship
    • Benefits
  • References
  • News
  • Contacts
  • cz
  • en
logo
Home
Company profile
  • Company profile
  • About CSG Group
  • Documents and certificates
  • Grant Projects
  • Whistleblowing
  • ESG Management
  • Et-link
Products
  • GCA Radar Sets
  • Air-traffic Surveillance Radar Systems
  • Precision Approach Radars
  • Air Traffic Control Systems
  • Radome
  • ATC Simulator
Services
  • Anechoic Chamber
  • Customer services
Career
  • Available positions
  • Students support and internship
  • Benefits
References
News
Contacts
  • cz
  • en

FAT (Factory Acceptance Test)

Once the radar has been tested and its overall functionality has been verified, the radar can be handed over to the customer. The handover procedure takes place on our premises in Pardubice, Czech Republic, and, once final assembly has been performed, also at the customer’s. The customer attends the official testing of the whole system and accepts the radar once the testing has been successfully completed. The radar is then disassembled, packed and sent to the customer. The radar can be transported to the customer’s site by road transport, rarely by air, but often by sea.

6a32eb1d-fat3-1-1024x682.jpeg fab78171-fat2-1-1024x682.jpeg 1d8cd6be-skoleni3-1024x768.jpeg

Installation on-site

When the system is delivered to a designated site its installation is carried out. The installation takes several weeks, depending on the range of assembly work and a radar type. It involves the assembly of radar boxes, connection of wiring, and fitting of the antenna system. The whole system is then tested and local staff is trained. The final installation of our system is performed by the workers from our production hall and from the maintenance service center as they always assemble the same system in the production hall in Pardubice.

128b3555-inst1.jpeg 5de7696d-inst3-1024x683.jpeg 9ed8d44e-inst2-1024x683.jpeg e1a0f39c-inst5.jpeg 3889146f-inst4.jpeg

SAT (Site Acceptance Test)

At the very end of the delivery process the radar undergoes to final testing by the customer and local authorities. Upon successful completion of all tests, the radar is handed over to the customer for use. Simultaneously, the radar attending staff receives a second training which directly involves the newly installed system.
It is often the case that our specialists also complete data integration of our equipment in the existing air-traffic management equipment used in a given country.

It needs to be emphasized that chemical processes, mechanical production and other technical operations performed by our company involve manipulation with hazardous and other waste and ensuring of its proper disposal. Therefore, the portfolio of our activities also comprises introduction of breakthrough technologies and industrial materials because only this attitude helps us satisfy the ever growing demands of all production departments.

Stránky

1               2              3              4

logo
+420 466 052 400
info@eldis.cz
ELDIS Pardubice, s.r.o.
Dělnická 469
533 01 Pardubice
Czech Republic
more information
Terms of Use
© 2020 ELDIS Pardubice, s.r.o. | eclair & ponovu
logo
Home
Company profile Submenu
Company profile
About CSG Group
Documents and certificates
Grant Projects
Whistleblowing
ESG Management
Et-link
Products Submenu
GCA Radar Sets
Air-traffic Surveillance Radar Systems
Precision Approach Radars
Air Traffic Control Systems
Radome
ATC Simulator
Services Submenu
Anechoic Chamber
Customer services
Career Submenu
Available positions
Students support and internship
Benefits
References
News
Contacts
  • cz
  • en
×

Cookies and privacy policy

This website uses cookies which are necessary for this site to work properly.

For more information read our Privacy Policy

Necessary only
More options
Allow all cookies